Quick
Search: 
 
advanced search
 GSW Home    GeoRef Home    My GSW Alerts    Contact GSW    About GSW    Journals List    Help 
  Environmental and Engineering Geoscience   Don't get GSW? Talk to your librarian.
JOURNAL HOME HELP CONTACT PUBLISHER SUBSCRIBE ARCHIVE SEARCH TABLE OF CONTENTS

Environmental and Engineering Geoscience; November 2006; v. 12; no. 4; p. 337-352; DOI: 10.2113/gseegeosci.12.4.337
© 2006 Association of Engineering Geologists
This Article
Right arrow Figures Only
Right arrow Full Text
Right arrow Full Text (PDF)
Right arrow Submit a response
Right arrow Alert me when this article is cited
Right arrow Alert me when eLetters are posted
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Similar articles in ISI Web of Science
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow reprints & permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by KASMER, O.
Right arrow Articles by ULUSAY, R.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation

Stability of Spoil Piles at Two Coal Mines in Turkey: Geotechnical Characterization and Design Considerations

OZGU KASMER1 and RESAT ULUSAY1

1 Applied Geology Division, Department of Geological Engineering, Hacettepe University, 06532 Beytepe, Ankara, Turkey

One of the major problems in surface mining of coal is the stability of disposed overburden materials. Geotechnical considerations are thus very important in rational planning for disposal, reclamation, treatment, and utilization of mine waste material. The subject of this study is the stability of spoil piles at open pit coal mines located in the Central Anatolia, Turkey. The coal is produced from two adjacent open pits. While a large portion of the spoil piles dumped at the Central Pit has experienced slope failure, no spoil pile instability has been experienced at the South Pit. This article outlines the results of field and laboratory investigations to describe the mechanism of the spoil pile failure in the Central Pit and the geotechnical design considerations for the spoil piles at the South Pit based on the experience gained from the previous spoil failures. Limit equilibrium analysis carried out for the large-scale spoil failure indicated that deep-seated sliding along the interface between underclay and dragline spoil piles and rotational slip through the overburden spoil material may be all occurring simultaneously as water migrates through these areas. Sensitivity analyses revealed that spoil pile instability is not expected at the South Pit when the current spoil placement method is used as long as the generation of high water pressures in the spoil piles is not permitted. Comparisons between the results of finite element analysis and long-term monitoring data also confirmed the results of sensitivity analyses and indicated a vertical deformation associated with compaction of the spoil material.

Key Words: Combined Failure • Movement Monitoring • Numerical Analysis • Open Pit • Spoil Pile Stability







JOURNAL HOME HELP CONTACT PUBLISHER SUBSCRIBE ARCHIVE SEARCH TABLE OF CONTENTS
Copyright © 2008 by Association of Engineering Geologists