Quick
Search: 
 
advanced search
 GSW Home    GeoRef Home    My GSW Alerts    Contact GSW    About GSW    Journals List    Help 
  Environmental and Engineering Geoscience   GSW 2008 Users' Group Meeting
JOURNAL HOME HELP CONTACT PUBLISHER SUBSCRIBE ARCHIVE SEARCH TABLE OF CONTENTS

Environmental and Engineering Geoscience; May 2006; v. 12; no. 2; p. 147-160; DOI: 10.2113/12.2.147
© 2006 Association of Engineering Geologists
This Article
Right arrow Figures Only
Right arrow Full Text
Right arrow Full Text (PDF)
Right arrow Submit a response
Right arrow Alert me when this article is cited
Right arrow Alert me when eLetters are posted
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Similar articles in ISI Web of Science
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow reprints & permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by MOORE, H. L.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation

A Proactive Approach to Planning and Designing Highways in East Tennessee Karst

HARRY L. MOORE1

1 Geotechnical Engineering Section, Tennessee Department of Transportation, 7345 Region Lane, Knoxville, TN 37914

The East Tennessee landscape consists of varied topography that reflects the lithology and geologic structure of the area. Karst makes up a large part of the East Tennessee landscape and is very problematic in locating, designing, and constructing highways. Instead of a reactive approach to dealing with karst in highway planning, design, and construction, this paper proposes a proactive methodology that is needed in karst terrain. Types of karst problems include sinkholes, caves and karren, collapse incidents, and groundwater contamination. Typical reactive remedial measures used in correcting karst-related highway problems include bridging, drainage alteration, and relocation. Proactive concepts implemented by the Tennessee Department of Transportation include avoidance measures such as relocation of the roadway and drainage design methods including impervious lined drainage ditches and highway runoff filtering systems. Additional proactive drainage measures include the use of graded rock pads, overflow channels from sinkholes to free-draining areas, sinkhole opening improvement and protection, and curbs for embankment sections. Innovative and cost-effective remedial concepts for solving karst-related geotechnical problems include avoidance, using lined ditches and graded rock pads, and other bridging- and drainage-related concepts. Stringent land use and building codes for karst areas are required to ensure the success of karst-related remedial design concepts proposed for highways.

Key Words: Karst • Sinkholes • Highways • Remedial Design • East Tennessee







JOURNAL HOME HELP CONTACT PUBLISHER SUBSCRIBE ARCHIVE SEARCH TABLE OF CONTENTS
Copyright © 2008 by Association of Engineering Geologists